Journal of Management Research and Analysis (JMRA) open access, peer-reviewed quarterly journal publishing since 2014 and is published under auspices of the Innovative Education and Scientific Research Foundation (IESRF), aim to uplift researchers, scholars, academicians, and professionals in all academic and scientific disciplines. IESRF is dedicated to the transfer of technology and research by publishing scientific journals, research content, providing professional’s membership, and conducting conferences, seminars, and award programs. With more...

Article type

Original Article


Article page

357-366


Authors Details

Siddesh Pai*, Neeraj Anand, Ankur Mittal, Indrasen Singh


Article Metrics


View Article As

 


Downlaod Files

   






Article statistics

Viewed: 1375

PDF Downloaded: 738


Developing a framework for mitigation of project delays in roads and highways sector projects in India


Original Article

Author Details : Siddesh Pai*, Neeraj Anand, Ankur Mittal, Indrasen Singh

Volume : 5, Issue : 3, Year : 2018

Article Page : 357-366

https://doi.org/10.18231/2394-2770.2018.0057



Suggest article by email

Get Permission

Abstract

Roads and highway sector projects in India are affected with enormous delays. Over the last decade, as a result of paradigm shift in the volume and capacity of the road construction sector, it is very important to systematically analyze the factors of delays and to build up a concise understanding amongst the roads and highways professionals. Adopting a comprehensive project stakeholders analysis namely client, consultant and contractor, the research identified the important factors affecting the delays in Indian roads and highway construction industry and then establishing the association between factors to develop the prediction models to assess the impact of these delay factors. A questionnaire survey and personal interviews methodology was used for this research. Most critical variables causing construction delay were analyzed using factor analysis. These results will significantly contribute in controlling the time overruns in Indian road construction industry. This project delays forms a challenge for developing countries like India, where exponential costs result from difficulty in recognizing and mitigating the project delay factors. This research focuses on prominent factors causing delays in road construction industry, and accordingly proposes a suggestive framework to design a construction project in an efficient manner and assisting mitigating of delays.

Keywords: Project delays, Framework analysis, Factor analysis, Conceptual framework


How to cite : Pai S, Anand N, Mittal A, Singh I, Developing a framework for mitigation of project delays in roads and highways sector projects in India. J Manag Res Anal 2018;5(3):357-366

This is an Open Access (OA) journal, and articles are distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 License, which allows others to remix, tweak, and build upon the work non-commercially, as long as appropriate credit is given and the new creations are licensed under the identical terms.